Progress is being made, only slowly. All of the tile is up except for the 3 linear feet of the bullnose trim tile, which we were short on and had to have additional pieces shipped in. There are literally two more tile cuts left. The next pressing milestone is that the tub is scheduled to be reglazed this coming Monday. So the tile needs to be grouted and sealed, water working in the shower and the tub needs to be as clean as it can be. The 2/3rds of the working plumbing is making things a little bit more bearable in the meantime. The extended vanity is already a huge improvement as illustrated by the amount of bathroom items and construction items laid out.