Tub Before
Tub After
A few steps in the right direction this week. Grouting has begun, only to run out of grout, to no surprise was not in stock and now we have to wait until it comes in to finish. Confused, the tile guy claimed that the 10 lbs of grout would be close, but should be fine to get the job done. And by close you mean approx. 50 sf short. Above the accent band on the long wall and the short wall are left to be grouted.
The tub was reglazed to a new bright and shiny finish. Confused, the reglazer man rocked the stone washed jeans and matching jean jacket with a mohawk and was convinced that the owner of Google lived in North Bexley. There was a constant barrage of swearing from the bathroom while the process was underway. He approved our choice of caulk to seal the edge and gave some rules about cleaning the tub, including no bleach based products. A two-hour stint later, the tub is well on it's way to curing. We were also forced to turn on the heat so the tub could cure at the appropriate 65 degree temperature.