Bathroom progress has been slow this week due to a jam packed work week and long hours for deadlines. The modified plumbing has made it from the floor of Lowe's to the floor of the bathroom and that is about it. With some help from Best Man Steve, a couple of sheets of drywall were hung in the closet area and above the tub. Plumbing is still in progress and that will be left at that. Luckily, there is plenty of content on the garden to supplement the inactivity with the bathroom.
Edamame's are coming in, for those of you who are from Ohio and not Asian, that is soy beans. The squirrels ate the rest of the soy bean plants and we are left with 4, which should provide one dinner's worth of edamame.
The first harvest of non-herbs are the banana peppers which were made into pizza. We have 3 pepper plants that are going yield far more than we can consume, so small batches are making their way to work for distribution.

Diesel is over the remodel already, which is similar to the face he showed on the kitchen remodel. He found shelter in the shopping bag on the bed and was hoping that his dad would stop hammer-drilling the bathroom floor and just finish the plumbing already.

No comments:

Post a Comment